We’ll be cutting and stacking lumber in preparation for the bed build and setting the build line to be ready for building beds Saturday.
FEB 12: LUMBER PRE-CUT 3 pm – 4:30 pm
Feb 5, 2025
We’ll be cutting and stacking lumber in preparation for the bed build and setting the build line to be ready for building beds Saturday.