We will be building 56 or more beds. Lots of sanding will be needed. Assembling, then branding and staining.
Feb 15, 2025 (Saturday)-CORE BUILD at Delta College
Feb 5, 2025
We will be building 56 or more beds. Lots of sanding will be needed. Assembling, then branding and staining.